Currently we offer 3 types of acquisition for houses and villas. Depending on the option chosen and the stage of construction: To gray, in red, to key, the price for acquisition can be lower or higher.

For more details please consult the section Price and Models, or contact a sales representative of the Residential Ensemble Allegria.

VARIANTS ACQUISITION

To red

Variant represents:
  • digging and poured foundation;
  • falsework, polished and casting listing 0;
  • mounted and fixed the sanitary installation listing 0;
  • mounted wall ext. with inside and outside insulation;
  • falsework and poured plate to ground floor;
  • mounted roof - lining and tiles;
  • poured sidewalks and alleys access;
  • mounted fence and gates.

To gray

Variant represents:
  • digging and poured foundation;
  • falsework, polished and casting listing 0;
  • mounted and fixed the sanitary installation listing 0;
  • mounted wall ext. with inside and outside insulation;
  • falsework and poured plate to ground floor;
  • mounted roof - lining and tiles;
  • poured sidewalks and alleys access;
  • mounted fence and gates;
  • mounted PVC joinery;
  • mounted entry door;
  • finishing walls and socle – external.

To key

Variant represents:
  • digging and poured foundation;
  • falsework, polished and casting listing 0;
  • mounted and fixed the sanitary installation listing 0;
  • mounted wall ext. with inside and outside insulation;
  • falsework and poured plate to ground floor;
  • mounted roof - lining and tiles;
  • poured sidewalks and alleys access;
  • mounted fence and gates;
  • mounted PVC joinery;
  • mounted entry door;
  • finishing walls and socle – external;
  • connecting to network of power supply ;
  • connecting to network of gas supply ;
  • connecting to network of water supply;
  • connection to network sewage;
  • executed sanitary installation;
  • executed thermic installation;
  • executed the electrical installation ;
  • poured concrete;
  • executed and finished walls and interior ceiling of rigips;
  • mounted interior doors;
  • mounted sandstone, faience and sanitary objects;
  • mounted parquets;
  • mounted interior staircase;
  • mounted thermic central and radiators.